
Meraas Villas, Townhouses and Island Homes: Windows and NOC
Meraas villas and townhouses line the coast of Dubai, from Bluewaters and La Mer to Jumeirah Bay, with Cherrywoods inland. The company dates from 2007, belongs to Dubai Holding and has 4.13 stars from 1,595 Google reviews on four listings.
Meraas reviews on Google
Topics people write about most often:
Leave a requestName, number, kind of work
Homes and communities in photos
Photos: Sudheeshthulaseedharan, Wikimedia Commons, CC BY-SA 4.0, resized, Sudheeshthulaseedharan, Wikimedia Commons, CC BY-SA 4.0, resized, Safasaleem, Wikimedia Commons, CC BY-SA 4.0, resized, cropped
Meraas communities
| Community | Homes | Built | About | Source |
|---|---|---|---|---|
| Bluewaters | 702 apartments, 17 townhouses | Opened November 2018 | Apartments and townhouses on an island | page |
| City Walk | about 1,300 | — | Apartments above retail streets | page |
| Port de La Mer | — | Apartments and townhouses on a marina | page | |
| Cherrywoods | 378 | Handed over December 2023 | Three and four-bedroom townhouses | page |
| Sur La Mer | — | Three to five-bedroom homes, Jumeirah 1 | page | |
| Villa Amalfi | — | Villas on Jumeirah Bay | page |
Homes by the water and one inland
Bluewaters is the postcard. The island sits 400 metres off the JBR beach, opened in November 2018 and holds 702 apartments with 17 townhouses next to Ain Dubai. City Walk is the urban counterpart, about 1,300 flats above shops and cafes. Port de La Mer mixes apartments and townhouses around a marina, and the manager describes its rooms with floor-to-ceiling windows on the Gulf.
Villas are fewer. Sur La Mer lines up three to five-bedroom houses of Italian character. Villa Amalfi on Jumeirah Bay has sandy stone facades with bronze accents. Bulgari Ocean Mansions are only seven. Cherrywoods, the first townhouse community of Meraas, has 378 homes in Dubailand and was handed over in December 2023. Nad Al Sheba Gardens and The Acres are the current villa launches.
Clues about the glazing
Sales pages drop a few. Nad Al Sheba Gardens is presented with a luxurious aluminium finish, and The Acres with double-height living rooms and floor-to-ceiling glass. Nothing is said about thermal breaks or coatings. Bronze accents at Villa Amalfi hint at a special finish, which is far harder to match than a RAL shade, so keep any leftover profile from the original order.
What the community rules leave open
Minor jobs inside the home are easy, facade jobs are not. The rule book of Dubai Holding Community Management defines a minor modification as non-structural work that does not affect structural integrity, the external facade or common areas. Same-day access covers handyman visits that finish by evening. Anything longer needs a Minor Modifications Permit, valid up to seven days, requested in the mobile application.
Two items are fenced off by name: balcony enclosures and modifications to the external facade need prior written approval. Residents of sea view flats ask about the first one most, usually to stop wind. A frameless wind screen can be read the same way, so ask.
Meraas NOC for new windows
Sort the job first. Inside work that ends the same day is registered at the gate. Inside work that runs on takes a Minor Modifications Permit. Outside work is a major request: an application in the app, the fee, plans and specifications, then the approval of the developer, the manager and the authority. The penalty table sets AED 2,000 for facade work without approval, starting with a warning and doubling on repetition.
Official pageHours, deliveries and noise
Plan the crew around the clock in the book. Work is allowed from 8 AM to 6 PM, loud drilling only between 9 AM and 1 PM and again from 3 PM to 5 PM, and Sundays and public holidays stay quiet. Glass arrives on stillages, and a truck that blocks the road or leaves packs overnight breaks another clause. In a Bluewaters tower book the freight lift before the factory ships.
Choosing units for a marina front
Rain driven by wind reaches the second track of a slider on an exposed terrace. A lift and slide with compression seals closes better than a plain sliding door, though the leaf grows heavier. Balustrade glass has to be laminated and 1,200 mm high. Overhead panes in a terrace roof are laminated too, with a system that holds the fragments after breakage.
Ask for stainless rollers and a coating test report. Rinse frames with fresh water after a sandstorm, since salt and dust together scratch the powder. Google reviewers of the Meraas sales boutique write about location, luxury property and the latest projects. The sea air comes with that location.
Meraas, About us, Wikipedia, Meraas, Wikipedia, Bluewaters Island, Dubai Holding communities, Bluewaters, Dubai Holding communities, Port de La Mer, Meraas, Villa Amalfi, Meraas, Nad Al Sheba Gardens Villas, Meraas, The Acres Villas, Dubai Holding Community Management, Rules and Regulations, 1 October 2026, Dubai Municipality, Dubai Building Code 2021
Recommended companies
Find the right rating in two taps
Tell us what you need and where. We open the matching top 10.
Questions
Does Meraas have villas?
Yes. Sur La Mer, Villa Amalfi, Bulgari Ocean Mansions, Nad Al Sheba Gardens and The Acres are villa projects, and Cherrywoods in Dubailand consists of townhouses only.
May I enclose a balcony on Bluewaters?
Not without prior approval. The community rules list balcony enclosures among works that are prohibited unless the manager agrees in writing before they start.
When can contractors drill?
From 9 AM to 1 PM and from 3 PM to 5 PM, Monday to Saturday in the minor works chapter. Sundays and public holidays are excluded.
How many homes are in Cherrywoods?
The community page shows 378 townhouses with three and four bedrooms. Meraas gives 4 December 2023 as the handover date.










